In accordance with the "Environmental Impact Assessment Law of the People's Republic of China" and the "Measures for Public Participation in Environmental Impact Assessment" and other relevant regulations, the environmental impact assessment information of Jiangsu Huaxing Laser Technology Co., LTD. 's gallium arsenide and indium phospide semiconductor epitaxial wafer production process upgrading and renovation project is hereby made public for the second time.
I. Basic Project Information
1. Project Name
The project of upgrading and upgrading the production process of gallium arsenide and indium phosphide semiconductor epitaxial wafers of Jiangsu Huaxing Laser Technology Co., LTD.
2. Project Overview
Construction Entity: Jiangsu Huaxing Laser Technology Co., LTD.
Construction location: North side of Liaohe West Road and west side of Huashan North Road, Economic Development Zone, Pizhou City (relying on the existing factory area for construction);
Construction nature: Technological transformation;
Project investment: The total investment of the project is 100 million yuan.
Construction content and scale Utilizing the existing 5,000 square meters of factory buildings, over 10 sets of equipment such as metal-organic chemical vapor deposition systems, purifiers, and tail gas treatment systems were phased out. Additionally, more than 20 sets of equipment including metal-organic chemical vapor deposition systems, contact lithography machines, magnetron sputtering, electron beam evaporation, nanoimprint, and purifiers were purchased and installed. Upgrade and renovate the existing production line. After the transformation is completed, the annual production capacity of gallium arsenide semiconductor epitaxial wafers will be 50,000 pieces and indium phosphide epitaxial wafers 10,000 pieces.
Ii. Key Points of the Environmental Impact Assessment Conclusion:
The project of upgrading and upgrading the production process of gallium arsenide and indium phosphide semiconductor epitaxial wafers of Jiangsu Huaxing Laser Technology Co., Ltd. complies with the requirements of relevant industrial policies. The site selection conforms to the relevant planning requirements. During the production process, the concept of clean production is followed. The various pollution prevention and control measures adopted are technically feasible and economically reasonable, which can ensure the long-term stable and compliant discharge of all kinds of pollutants. The prediction results show that the pollutants discharged by the project have a relatively small impact on the surrounding environment and environmental protection targets, and the impact on the regional environment is acceptable. After taking targeted risk prevention measures and implementing emergency response plans, environmental risks are controllable.
Iii. Online link to the full text of the draft environmental impact report for public comment and methods and channels for accessing the paper version of the report
The full text of the "Environmental Impact Report for the Upgrading and Renovation Project of Gallium Arsenide and Indium Phosphide Semiconductor Epitaxial Wafer Production Process of Jiangsu Huaxing Laser Technology Co., LTD." (Draft for Comment) can be accessed online
https://pan.baidu.com/s/1w_ZnqrNaKQM3s11DbsvEHQ?pwd=by7s
(Extraction Code: by7s
The ways and channels for consulting the paper report
Environmental impact assessment unit: Jiangsu Nanda Environmental Protection Technology Co., LTD.
Contact Person: Mr. Zhou
Telephone: 18852086931
Email: 994210025@qq.com
Address: No. 27, Hengjing Road, Nanjing Economic and Technological Development Zone
Iv. Scope of the public for soliciting opinions
Citizens, legal persons and other organizations within the scope of the environmental impact assessment for the project of upgrading and upgrading the production process of gallium arsenide and indium phospide semiconductor epitaxial wafers of Jiangsu Huaxing Laser Technology Co., LTD. We sincerely invite citizens, legal persons and other organizations outside the scope of the environmental impact assessment to offer their valuable opinions and suggestions. We will also take them seriously.
Key points: The public is invited to offer their opinions on the reliability and feasibility of the engineering analysis, current environmental status, environmental impact prediction and evaluation conclusions in the report. In particular, please offer more valuable opinions and suggestions on the rationality, feasibility and effectiveness of the pollution prevention and control measures proposed in the report. If the public sincerely and promptly offers any other constructive suggestions for the project, we will actively adopt them and express our heartfelt gratitude.
V. Online Link to the Public Opinion Form
The public network sheet link: https://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html
Vi. Ways and Channels for the Public to Offer Opinions
The public can submit the completed public opinion forms and other materials to our organization within the prescribed time limit through letters, faxes, emails or on-site filling, etc., to reflect opinions and suggestions related to the environmental impact of the construction project. When the public submits opinions, they should provide valid contact information. The public is encouraged to submit their opinions under their real names and provide their permanent addresses.
Vii. The start and end time for the public to submit their opinions
From the date of this information disclosure, within 10 working days, the public can express their opinions and views on the project construction and environmental impact assessment work by sending letters, faxes, emails, on-site interviews, filling out public opinion forms, etc. Thank you for your participation!
May 13, 2025